We started out by detaching the 1/0 round wire between the west end of Station Track 2 and the West Switch, about 1,000 feet to the west, and hanging it off to the side with rope. The hangers were replaced with "dollies," or pulleys, and a guide rope was threaded through these, taking the place of the old wire. (In the photo at left, taken by Adam Robillard, Max is replacing the round-wire hanger with a pulley and I'm about to hand him the guide rope.) When finished with this, we went and got a reel of new 3/0 grooved wire, which was connected to the end of the guide rope and pulled through the 1,000 foot's worth of pulleys.I had to leave early, but later on the line crew connected the new grooved wire to the frog at the West Switch and started hooking it up to the hangers heading eastbound. The intention is to replace all of the 1/0 round wire on the west station leads, including installation of brand new
While I was out with the line crew, Gerry Dettloff (right) was back in the shop doing inspection work on the 309. He was able to get all of the motor and truck inspection work done on the car, which is some of the toughest and dirtiest work of the inspection process. Thanks, Gerry!!
0 comments:
Post a Comment